Completed Stone Façade

The Problem

Pre-cast concrete with polyester powder coated frames and glazing work. The pre-cast concrete was leaching organic deposits on the glazing and frames.

Project

Doffed the stone and sealed with D-Tox then restored the glass and frames. All floors now let, helped by these works. Access via temporary Cradles, Crash Decks, MEWP & Abseilers.

The Results

Improvement
85%
Duration
14 weeks
Before
Surface:	Pre-cast concrete/Polyester powder coated frames/glazing
After
Project:	Pre-cast concrete leaching organic deposits on glazing and frames.  Doffed stone 	and sealed with D-Tox then restored the glass and frames.  All floors now let 	helped by these works.